Gazpromneft-Yamal Awards eDrilling Contract for Real-Time Optimization Software

eDrilling announced today that it has signed a contract with Gazpromneft-Yamal, a Gazprom Neft subsidiary, for the use of eDrilling’s software to optimize its drilling operations in the Tyumen region. “Our objective is to improve…

Artificial Intelligence, Predictive Analytics, and our Digital Twin at IADC/SPE

Firstly, our paper (presented by Maryam) has been chosen as one of the highlights at this year's SPE/IADC Drilling Conference. She will talk about how our AI technologies are effectively used to derive conclusions (i.e. diagnosis or a prediction),…

Preparing for Otta/Vinstra exploration well using digital twin

MOL is preparing for upcoming exploration, by drilling well 3/7-11 S Otta/Vinstra (in PL 539) in wellSim using digital twin prior to operations. Rowan Viking is contracted for the well, located in the southern part of the North Sea, close…

Seeking new colleagues at our APAC office in Singapore

We are expanding rapidly, and we are looking for great people to join our team in Singapore.
,

Webinar: Pre-drill your well to ensure hazard and NPT free, and optimized, drilling operations

On Wednesday November 21, we will arrange a webinar titled "Pre-drill your well to ensure hazard and NPT free, and optimized, drilling operations" Attend this webinar to learn more about how you, utilizing eDrilling’s digital twin, can…

Webinar: Upgrade your well design and engineering software without having to replace it

  We understand clearly the industry’s need to improve safety margins and reduce and rid themselves of risk, not to talk about the need to drastically reduce well planning time. At the same time, we understand the investment you…